General Aviation Parking Lot Improvements
Type
Infrastructure Project
Summary
The goal of this project is to improve the General Aviation (GA) Terminal Parking Lot conditions. This project is broken into two phases. Phase one includes Milling and Overlaying the two south sections of the parking lot in addition to part of Dennis Weaver Drive into the parking lot itself. This will also include removal of all old signs and posts, with re-design of new ADA compliant signage, striping, and the install of a new ADA ramp.
Phase two will include removing the asphalt and subgrade in the far two north sections of the parking lot and filling it back in with 6 inches of base rock, geo grid matting, and top soil. We will then seed the area and those far two north sections will be used as overflow parking, designed to only be used during large events.
Status
- Project Proposed
- Funding for Design Secured
- Design Process
- Funding for Construction Secured
- Bid Process
- Contract Awarded
- Under Construction
- Complete