On August 1, 2026, the Joplin City Council voted to adopt the following Use Standards for Data Centers, adding these standards as a text amendment to the City’s Development Code.
Article 4 (Zoning Districts & Use Standards) Section 4.04 (Specific Use Standards), of Chapter 29-A (Zoning Code) of the Joplin Municipal Code, was amended to add the following Specific Use Standard:
X. Data Centers. Data Centers are permitted in the M-2 (Heavy Industrial) zoning district. All data centers shall comply with the following performance standards:
- Buffering: a minimum setback of 50 feet shall be required for all structures and improvements (except fences, walls, berms, landscaping materials, ancillary uses, or other buffer barrier methods) located on the property. Landscape buffers shall be required along adjacent property lines, in accordance with Table 6-03 buffer planting requirements.
- Data centers shall require a minimum 300 feet distance setback from a residential use or district, church, daycare, park, lodging establishment (including bed and breakfast inns, group homes, senior living facilities, campgrounds and recreational parks, hotels, short-term rentals), schools, and any residential, lodging, civic, or public use not specified. The 300 foot buffer shall be measured from the nearest structure or generator of the subject property to the property line on which a residential use or district, church, daycare, park, lodging establishment (including bed and breakfast inns, group homes, senior living facilities, campgrounds and recreational parks, hotels, short-term rentals), school, and any residential, lodging, civic, or public use not specified, is located. This provision does not apply to fences, walls, berms, landscaping materials, ancillary uses, or buffer or barrier methods.
- Lighting: A photometric diagram showing predicted maintained lighting levels produced by the proposed lighting fixtures shall be required. The maximum maintained vertical footcandle at an adjoining residential property line shall be 0.5 footcandles, measured at three feet above grade. All lighting shall comply with the lighting requirements in Article 6.05: Outdoor Lighting.
- A utility site plan shall be submitted.
- All data centers shall be contained within a primary structure, subject to the non-residential building design requirements in Article 5-02. The applicant shall provide building elevations.
- Generators and noise: If generators are located outside of an enclosed building a screening wall shall be required. Generators may be tested only between 10am and 5pm, Monday through Friday. The sound pressure level (SPL) attributable to infrastructure of the data center property shall not exceed 80 dBC and dBA, as measured at all data center property lines. The SPL attributable to the facility shall not exceed 45 dBC and dBA within 50’ of the property line of any allowed residential use or district, church, daycare, park, lodging establishment (including bed and breakfast inns, group homes, senior living facilities, campgrounds and recreational vehicle parks, hotels, and short-term rentals), schools, and any residential, lodging, civic, or public use not specified. A site plan shall be provided to the City, indicating expected/projected decibel levels at each property line. The applicant shall identify the number, size, fuel source, and testing schedule for backup generators. In addition, a noise test shall be conducted displaying SPL levels measured before any improvements are made.
- On site monitoring of sound: Once the project is completed, the permit holder shall provide to the City an affidavit that includes the following information:
- Name and qualifications of the person who measured the sound pressure levels, requiring a supervised and wet stamped report by a qualified Missouri licensed professional engineer.
- Equipment used: List all test results; equipment; equipment settings; copies of National Institute of Standards (NIST) traceable calibration certificates; drawings and pictures of the test setup including pertinent distance measurements; and weather conditions during the tests including wind speed, temperature and relative humidity.
- Location of the noise measurements depicted on a scaled site plan. The points of measurement shall be at all property lines and generally at the points on those property lines most susceptible to noise from the applicable equipment.
- Sound pressure levels (SPL), measured in dBC, at each property line.
- Time and duration of measurements.
- A statement attesting to the accuracy of the information provided and a guarantee that the permit holder will not run their equipment, including generators, at a greater sound pressure level than allowed in Section 4. X. 6 (Generators and Noise). The city reserves the right to require independent verification of noise measurements and/or to request additional measurements at different points on the property, at the developer’s cost. All measurements must comply with the noise levels established in Table 4-05: Non-residential Performance Standards, of the Joplin Development Code.
- Utilities and Resources conditions: All data centers are required to submit a Service Availability (Will Serve) Letter from local utility providers that confirms the capacity and commitment to serve the utility demand for the proposed data center. All data centers shall include the expected water usage and the maximum power demand (megawattage) of the proposed development. In the event that upgrades to utility infrastructure are required to serve the demand of the proposed development, but such upgrades would not be required otherwise, such cost shall be borne solely by the developer and/or end user. The developer or end user shall verify this commitment by providing the City with a construction contract/development agreement, memorandum of understanding, or similarly applicable document between the developer and/or end user and the utility provider, providing certification that required improvements and consumption demand of the end user will prohibit cost recovery through rates, fees, surcharges, or pass-through mechanisms to customers other than the developer or end user. The applicant shall provide a map indicating the location of any new substations or substation upgrades required for the data center, and the location of new power lines serving the proposed data center. Substations shall be required on site or adjacent to the proposed development. The applicant shall also include a site plan indicating the water source for service to the subject property.
- Certain foreign adversaries shall be restricted from developing data centers within the City of Joplin. The determination of a foreign adversary shall be regulated on a case-by-case basis, as determined by the United States Department of State.
- Air Pollution: All data centers shall be required to submit an assessment identifying the air pollution impacts emissions from data center operations, including from electricity generated in order to meet the facility’s needs. The applicant shall identify all stationary and mobile sources of fine particulate matter, volatile organic compounds, and nitrogen oxides at the site, including but not limited to cooling equipment, and backup generators. The applicant shall specify best management practices for preventing and reducing the concentration of air-polluting emissions at the site. All emissions shall be compliant with all provisions set forth by the Environmental Protection Agency (EPA) standards, specifically the Clean Air Act and National Ambient Air Quality (NAAQS) standards, and the Missouri Department of Natural Resources (MODNR).
- Native Species: Prohibited landscaping materials shall include anything identified as an invasive species by the Missouri Department of Conservation.
- The City reserves the right to require an independent third-party analysis, at the developer’s expense, for any of tests, studies or analysis’ explicitly stated within this section, and for any tests, studies or analysis, not explicitly stated within these specific use standards related to the operational and use standards of the facility, excluding proprietary information or intellectual property, such testing may be required by the Director.
- Closed Loop Cooling System: All data centers shall be operated with a closed loop cooling system or other system that reduces water use. A closed loop cooling system means a system that recycles the same water or water mixture through an underground loop system in order to facilitate the transfer of energy between the closed underground loop and the earth.
- Cool Roof: All data centers shall be designed and operated with a cool roof. A cool roof means a roofing system designed to reflect more sunlight and emit absorbed heat through high solar reflectance and thermal emittance and through using lighter colors or special coatings that reflect invisible near-infrared light.
- Sustainability: All data centers shall achieve and maintain LEED standards or standards from a similar green building program for the life of occupancy.
- Roofs: All data centers shall enclose and/or screen all exterior and rooftop cooling equipment and any other data center accessory uses/structures to provide a visual and acoustic barrier from the property and surrounding area. Enclosures and/or screens shall be opaque to obstruct from view and reduce frequency and vibrations.
- Construction Timeline: Applicants shall submit the expected timeline for commencing construction and operation of the facility.
- Jobs: Applicants shall submit the estimated number of FTE jobs associated with the data center.
- Wastewater Management: All wastewater shall comply with Chapter 118, Utilities, of the Joplin Municipal Code. The applicant shall submit their wastewater management/treatment plan at the time of application. A pollutant scan of the wastewater generated shall be submitted to the City, once the data center is operational. Data centers shall require a City permit and shall fall under the unpermitted uses category under Chapter 118, Utilities.
- Energy Storage: All energy storage must comply with the most current edition of NFPA 855 and NFPA 75, as referenced in the 2024 International Fire Code (IFC) or latest edition of the IFC code. The applicant shall provide this information at the time of application.
- Generators: All data centers must utilize Tier IV compliant or certified backup generators, or Tier II with Selective Catalytic Converters (SCR) attached. If using natural gas turbines, data centers must utilize SCR using ammonia as the reducing agent.