Airport North Perimeter Road Phase 1

Type
Infrastructure Project
Summary
This project will reconstruct the north perimeter road on the west side of Runway 18-36, providing a safe, all-paved route between the Aircraft Rescue and Fire Fighting (ARFF) and Snow Removal Equipment (SRE) facilities and the main terminal apron. Major storm drainage improvements and dirt works have been included in the design of this new road.
The project will be completed in several phases as FAA grant funding allows. This phase 1 area includes construction of the new road starting from the main terminal apron and ending on the far end of runway 18-36.

Status

  1. Project Proposed
  2. Funding for Design Secured
  3. Design Process
  4. Funding for Construction Secured
  5. Bid Process
  6. Contract Awarded
  7. Under Construction
  8. Complete